{"id":1373,"date":"2025-07-12T11:31:05","date_gmt":"2025-07-12T11:31:05","guid":{"rendered":"https:\/\/hiroshima-energysupply.com\/?p=1373"},"modified":"2025-07-12T11:31:05","modified_gmt":"2025-07-12T11:31:05","slug":"lap-dat-he-thong-gas-cong-nghiep-tron-goi-cam-ket-an-toan-theo-tieu-chuan-nhat","status":"publish","type":"post","link":"https:\/\/hiroshima-energysupply.com\/en\/lap-dat-he-thong-gas-cong-nghiep-tron-goi-cam-ket-an-toan-theo-tieu-chuan-nhat\/","title":{"rendered":"Installation of Complete Industrial Gas System - Safety Commitment According to Japanese Standards"},"content":{"rendered":"<p data-start=\"367\" data-end=\"720\">In manufacturing plants, industrial gas systems are not only part of the energy chain but also directly affect <strong data-start=\"499\" data-end=\"550\">performance \u2013 operating costs \u2013 occupational safety<\/strong>.<br data-start=\"551\" data-end=\"554\" \/>However, to keep the gas system operating stably and without potential risks, the most important thing is <strong data-start=\"651\" data-end=\"719\">Construction according to standards and strict safety control from the beginning<\/strong>.<\/p>\r\n<p data-start=\"722\" data-end=\"911\"><strong data-start=\"722\" data-end=\"755\">Hiroshima Energy Supply (HES)<\/strong> provide service <strong data-start=\"773\" data-end=\"842\">Design - installation - acceptance of complete industrial gas system<\/strong>, committed to meet standards <strong data-start=\"862\" data-end=\"910\">Vietnam Fire Prevention and Control and Japanese Safety Standards<\/strong>.<\/p>\r\n\r\n\r\n<hr data-start=\"913\" data-end=\"916\" \/>\r\n\r\n<h3 data-start=\"918\" data-end=\"970\">\ud83d\udd27 Complete gas system installation \u2013 What does it include?<\/h3>\r\n<p data-start=\"972\" data-end=\"1314\">\u2705 <strong data-start=\"974\" data-end=\"1021\">Free site survey &amp; technical consultation<\/strong><br data-start=\"1021\" data-end=\"1024\" \/>\u2705 <strong data-start=\"1026\" data-end=\"1094\">Design gas diagram drawings, fire protection drawings, construction permit drawings<\/strong><br data-start=\"1094\" data-end=\"1097\" \/>\u2705 <strong data-start=\"1099\" data-end=\"1133\">Providing high quality materials<\/strong> (gas pipes, pressure regulators, safety devices...)<br data-start=\"1181\" data-end=\"1184\" \/>\u2705 <strong data-start=\"1186\" data-end=\"1257\">Construction - installation - welding - leak testing according to 6-step process<\/strong><br data-start=\"1257\" data-end=\"1260\" \/>\u2705 <strong data-start=\"1262\" data-end=\"1314\">Acceptance, handover &amp; system operation training<\/strong><\/p>\r\n\r\n\r\n<hr data-start=\"1316\" data-end=\"1319\" \/>\r\n\r\n<h3 data-start=\"1321\" data-end=\"1380\">\ud83d\udee1\ufe0f HES commits to Japanese style safety standards<\/h3>\r\n<p data-start=\"1382\" data-end=\"1437\">\ud83c\udfaf The system is strictly controlled according to the following factors:<\/p>\r\n\r\n<ul data-start=\"1439\" data-end=\"1709\">\r\n \t<li data-start=\"1439\" data-end=\"1510\">\r\n<p data-start=\"1441\" data-end=\"1510\"><strong data-start=\"1441\" data-end=\"1482\">Pipeline pressure \u2013 air leak test<\/strong> by specialized equipment<\/p>\r\n<\/li>\r\n \t<li data-start=\"1511\" data-end=\"1586\">\r\n<p data-start=\"1513\" data-end=\"1586\"><strong data-start=\"1513\" data-end=\"1530\">Explosion proof<\/strong> \u2013 install safety valve and accurate pressure gauge<\/p>\r\n<\/li>\r\n \t<li data-start=\"1587\" data-end=\"1649\">\r\n<p data-start=\"1589\" data-end=\"1649\"><strong data-start=\"1589\" data-end=\"1647\">Anti-static \u2013 grounding \u2013 clear hazard warning<\/strong><\/p>\r\n<\/li>\r\n \t<li data-start=\"1650\" data-end=\"1709\">\r\n<p data-start=\"1652\" data-end=\"1709\"><strong data-start=\"1652\" data-end=\"1709\">Fire prevention training for operators, internal certification<\/strong><\/p>\r\n<\/li>\r\n<\/ul>\r\n<p data-start=\"1711\" data-end=\"1852\">\ud83d\udca1 HES&#039;s team of engineers and workers are periodically trained according to Japanese standards, ensuring that all installation details are accurate - scientific - safe.<\/p>\r\n\r\n\r\n<hr data-start=\"1854\" data-end=\"1857\" \/>\r\n\r\n<h3 data-start=\"1859\" data-end=\"1916\">\ud83d\udccb Advantages of choosing HES&#039;s complete gas installation package:<\/h3>\r\n<p data-start=\"1918\" data-end=\"2140\">\u2714\ufe0f <strong data-start=\"1921\" data-end=\"1954\">Save time &amp; money<\/strong> \u2013 no additional costs outside the contract<br data-start=\"1987\" data-end=\"1990\" \/>\u2714\ufe0f <strong data-start=\"1993\" data-end=\"2038\">Synchronize the system from design to operation<\/strong><br data-start=\"2038\" data-end=\"2041\" \/>\u2714\ufe0f <strong data-start=\"2044\" data-end=\"2092\">Support legal documents, fire protection approval drawings<\/strong><br data-start=\"2092\" data-end=\"2095\" \/>\u2714\ufe0f <strong data-start=\"2098\" data-end=\"2140\">Regular maintenance \u2013 24\/7 technical support<\/strong><\/p>\r\n\r\n\r\n<hr data-start=\"2142\" data-end=\"2145\" \/>\r\n\r\n<h2 data-start=\"2147\" data-end=\"2167\">Applicable objects<\/h2>\r\n<ul data-start=\"2169\" data-end=\"2380\">\r\n \t<li data-start=\"2169\" data-end=\"2225\">\r\n<p data-start=\"2171\" data-end=\"2225\">Factory, industrial workshop, industrial park<\/p>\r\n<\/li>\r\n \t<li data-start=\"2226\" data-end=\"2292\">\r\n<p data-start=\"2228\" data-end=\"2292\">Restaurants, hotels, shopping centers use industrial gas<\/p>\r\n<\/li>\r\n \t<li data-start=\"2293\" data-end=\"2380\">\r\n<p data-start=\"2295\" data-end=\"2380\">Units that are using gas cylinders and want to switch to a safer pipeline system<\/p>\r\n<\/li>\r\n<\/ul>\r\n\r\n<hr data-start=\"2382\" data-end=\"2385\" \/>\r\n\r\n<h2 data-start=\"2387\" data-end=\"2452\">HES \u2013 Installing Japanese standard gas system, ensuring long-term operation<\/h2>","protected":false},"excerpt":{"rendered":"<p>In manufacturing plants, industrial gas systems are not only part of the energy chain but also directly affect performance - operating costs - labor safety. However, for the gas system to operate stably and without potential risks, [\u2026]<\/p>","protected":false},"author":1,"featured_media":1349,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27],"tags":[],"class_list":["post-1373","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-thong-tin-chuyen-nganh"],"_links":{"self":[{"href":"https:\/\/hiroshima-energysupply.com\/en\/wp-json\/wp\/v2\/posts\/1373","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hiroshima-energysupply.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hiroshima-energysupply.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hiroshima-energysupply.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hiroshima-energysupply.com\/en\/wp-json\/wp\/v2\/comments?post=1373"}],"version-history":[{"count":2,"href":"https:\/\/hiroshima-energysupply.com\/en\/wp-json\/wp\/v2\/posts\/1373\/revisions"}],"predecessor-version":[{"id":1375,"href":"https:\/\/hiroshima-energysupply.com\/en\/wp-json\/wp\/v2\/posts\/1373\/revisions\/1375"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hiroshima-energysupply.com\/en\/wp-json\/wp\/v2\/media\/1349"}],"wp:attachment":[{"href":"https:\/\/hiroshima-energysupply.com\/en\/wp-json\/wp\/v2\/media?parent=1373"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hiroshima-energysupply.com\/en\/wp-json\/wp\/v2\/categories?post=1373"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hiroshima-energysupply.com\/en\/wp-json\/wp\/v2\/tags?post=1373"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}